Introducing Battery Backup in Two Phases
Mountain View Solar now offers the capability to have your battery backup installed in two phases.
For lead-acid systems we first install a DC coupled grid-tied solar system using small temporary batteries. When you’re ready we install the full size battery bank and critical loads panel, and all installed equipment that you purchased in phase 1 is fully utilized.
For lithium-ion systems we first install a SolarEdge optimized array and StorEdge 7600 inverter with no batteries. When you’re ready we install the wall mounted LG Chem lithium pack and critical loads panel, and all installed equipment that you purchased in phase 1 is fully utilized.
Below is an example of phase 1 for a lead-acid system; small temporary batteries keep the battery based inverter operational. Since there are no loads on the inverter, all solar production is sent back to grid just like a standard grid-tied solar system.
Our customers asked, and we responded; mtvSolar continues to lead the way!